top of page

VD16 –ADNEC Public Toilets Refurbishment Works (stage 2A)

BRIEF:

  • Complete refurbishment of all finishes and fittings (including sanitary ware) of 7 sets of male/female toilets. The 7 sets of toilets are located at Halls 8-9,11, ICC Hall and adjacent to the Wedding Hall. 

  • The refurbishment works include demolition works and site preparation, finishing works and MEP works to the existing toilets.

FACTS:
Location:  Abu Dhabi
Client: ADNEC (Abu Dhabi National Exhibition Center)
Consultant: Serex International

 

PROJECT VALUE:
 AED4,465,000.00

CPC%20Logo_edited.png

GENERAL CONTRACTING LLC

Tel :  +971 2 6678812
Fax : +971 2 6678814
E-mail: info@cpcemirates.ae

 

P.O. Box 42311 
Abu Dhabi, United Arab Emirates

CPC 2024,  All Rights Reserved

  • Facebook
  • Twitter
  • YouTube
  • Pinterest
  • Tumblr Social Icon
  • Instagram
bottom of page