top of page

Calidus Factory, Al Ain

BRIEF:

  • Aircraft assembly factory building comprises of industrial facility including buildings and related sitework and utilities connection. Facilities includes the main assembly, ejection seat, flight preparation, water tanks, security room, aircraft paint shop, utilities building and modular security post.

  • Civil works, Electrical works, Security and Communication Distribution, sanitary, potable water, fire water, chilled water .

FACTS:
Location:  Al Ain Airport
Client: Calidus
Consultant: Architecture & Planning Group
Type of Contract: Design and Build
 

PROJECT VALUE:
 AED88,277,993.09

CPC%20Logo_edited.png

GENERAL CONTRACTING LLC

Tel :  +971 2 6678812
Fax : +971 2 6678814
E-mail: info@cpcemirates.ae

 

P.O. Box 42311 
Abu Dhabi, United Arab Emirates

CPC 2024,  All Rights Reserved

  • Facebook
  • Twitter
  • YouTube
  • Pinterest
  • Tumblr Social Icon
  • Instagram
bottom of page